Saturday, August 15, 2009

Thursday, August 13, 2009

Saturday, July 25, 2009

Wednesday, July 22, 2009

Friday, July 17, 2009

Stone Wall Completed

The final section of stone wall was finished by the driveway. 

The upper wall section was aligned to look as if it was going through the 
base of the tree.

Wednesday, July 15, 2009

Side rock wall

The stone wall near the garage was completed.

Stones were chipped to create the corner point.

Monday, July 13, 2009

Friday, July 10, 2009

Upper Stone Wall

The upper stone wall was completed with larger stone pieces to create 
more sturdiness and visual variety.

Wednesday, July 8, 2009

Begin Stone Work

The upper corner of the stone wall was started.

Matters loves to lay in the leveled sand.

The stones were sorted by size.

The earth was tamped to create the base for the wall.

Monday, July 6, 2009

More Soil Removed

More soil was removed from around the tree so that the top stone wall would meet the edge of the tree.
 
Soil was removed behind the tree so the finish DG patio would meet the driveway.
 
The 8 yard dirt box was filled completely to the top.
 
Sprinklers by the lemon trees were placed and set on the timer.
 

Wednesday, July 1, 2009

Soil Excavation

Soil level lowered 6" below finish level so new soil can be added to the planting areas.
 
Almost 8 yards of soil was removed .
 
Installation of drip irrigation in front beds and timers set.
 
 

Monday, June 29, 2009

Brick Path to Gate

We completed the brick path to the gate and moved the sprinkler heads in next to the pathway.
 
The earth was leveled and tamped as a base for the DG patio areas.
 

Friday, June 26, 2009

Wall Height Determined

A level line was drawn from the front patio and stepped down 4" to determine the final height of the stone wall.
 
Shade bed lowered to below curve path.
 
The side path was relaid and made narrower.
 
Daniel is happy to remove the old bricks.
 

Wednesday, June 24, 2009

Brick Path Near Garage

Bricks are laid near the garage.
 
The earth is carefully graded so the existing brick paths will align perfectly.
 
Plumbing connection is made for front spigot.
 
Electrial Connections are made to the timer and outdoor GFCI socket.