Wednesday, July 1, 2009

Soil Excavation

Soil level lowered 6" below finish level so new soil can be added to the planting areas.
 
Almost 8 yards of soil was removed .
 
Installation of drip irrigation in front beds and timers set.
 
 

Monday, June 29, 2009

Brick Path to Gate

We completed the brick path to the gate and moved the sprinkler heads in next to the pathway.
 
The earth was leveled and tamped as a base for the DG patio areas.