Friday, June 26, 2009

Wall Height Determined

A level line was drawn from the front patio and stepped down 4" to determine the final height of the stone wall.
 
Shade bed lowered to below curve path.
 
The side path was relaid and made narrower.
 
Daniel is happy to remove the old bricks.
 

Wednesday, June 24, 2009

Brick Path Near Garage

Bricks are laid near the garage.
 
The earth is carefully graded so the existing brick paths will align perfectly.
 
Plumbing connection is made for front spigot.
 
Electrial Connections are made to the timer and outdoor GFCI socket.
 

Monday, June 22, 2009

Completed Curved Brick Path

 

 
 
Installed a water spigot near the front gate.