Saturday, June 20, 2009

Friday, June 19, 2009

Valves Connected and Tested

The underground pipes are attached to the valves.

Risers are attached and the system flushed of debris.

Risers and sprayers are attached and fully tested using the controller box.

Patio Water Faucet and Replace Bricks

Patio Fountain Electrical

Thursday, June 18, 2009

Valves Installed

An inline back-flow preventer and manifold for 12 valves is installed.

Wednesday, June 17, 2009