A level line was drawn from the front patio and stepped down 4" to determine the final height of the stone wall.
Friday, June 26, 2009
Thursday, June 25, 2009
Wednesday, June 24, 2009
Brick Path Near Garage
Bricks are laid near the garage.
The earth is carefully graded so the existing brick paths will align perfectly.
Monday, June 22, 2009
Saturday, June 20, 2009
Friday, June 19, 2009
Valves Connected and Tested
The underground pipes are attached to the valves.
Risers are attached and the system flushed of debris.
Risers and sprayers are attached and fully tested using the controller box.